Finally we have the new proposals from WAG on changes to GPDOs for both domestic and non-domestic properties in Wales.
http://wales.gov.uk/consultations/planning/microgenconsultation/?lang=enConsultation period closes on 3rd July.
In summary it covers the installation of:
1. Non-domestic
Wind turbines
ASHPs
GSHPs
WSHPs
Solar panels
Flues for biomass and CHP systems
2. Domestic
Wind turbines
ASHPs
Solar panels on flat roofs
3. Agricultural/forestry
Structures to house biomass boilers, AD, and waste and fuel stores
Structures to house hydro turbines
Features:
Wind turbines and ASHPs only given permitted rights if MCS accredited and installed
No permitted rights for domestic building mounted turbines
Noise level of 45dB for turbines and ASHPs
Permitted rights for National Parks and AONBs - but not World Heritage sites or Conservation Areas
Specific geographical areas will also be excluded (to be defined and made available on a web application)
Non-domestic wind turbines - max hub height 15m
Domestic wind turbines - max overall height 11.1m
Solar panels on flat roofs allowed if max 1m high and at least 1m from edge of roof - as long as not visible from a highway