navitron
 
Renewable Energy and Sustainability Forum
UK's most popular Renewable Energy Forum May 24, 2012, 08:58:08 AM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Anyone wishing to register as a new member on the forum is strongly recommended to use a "proper" email address - following recent spam/hack attempts on the forum, all security is set to "high", and "disposable" email addresses like Gmail, Yahoo and Hotmail tend to be viewed with suspicion, and the application rejected if there is any doubt whatsoever
 
Recent Articles: UPDATE ON DECC APPLICATION FOR LEAVE TO APPEAL TO THE SUPREME COURT | Yingli Green Energy's PV Module Ranks No.2 in TUV Rheinland Energy Yield Test | Navitron Solar Showers at Glastonbury for Year 5!
   Home   Help Search Login Register  
Pages: [1]   Go Down
  Print  
Author Topic: At last  (Read 1231 times)
linesrg
Full Member
***
Offline Offline

Posts: 169



WWW
« on: July 24, 2011, 12:12:15 PM »

Good Afternoon,

As I sit down to watch the German Grand Prix I have a letter on the kitchen table with the signed contracts finally agreeing that my self installed, non-MCS approved 2.56kW addition to my ROO-FIT 1.28kW is a FIT installation, hooray.

Do I win any prizes for the delay in agreeing this install being agreed? What is most infuriating is that I consulted with SSE/ OFGEM prior to starting the install in Oct 2009.

I see that they have no more sun at Nurburgring than we do up here in Aberdeenshire........................

Regards

Richard

Richard
Logged

16off BP380 on a Lorentz tracker connected to 1off SMA SB2500 and 16off Chinese import 80W connected to a Fronius IG15 and 16off BP380 connected to a SWR2000.
Justme
Hero Member
*****
Offline Offline

Posts: 2877



« Reply #1 on: July 24, 2011, 12:39:19 PM »

About bloody time.  extrahappy extrahappy extrahappy
Logged

Navitron solar thermal system
30 x 58mm panel 259L TS
1200watts solar 120vdc
FX80 Solar controller
Victron 12v 3000w 120a
200w (250w peak) 12v turbine as a tester
6kva genny
6 x 2v cells 1550amp/h 5C
24 x 2v cells 700amp/h 5C
Total bank 4350 amp/h @12v
StBarnabas
Hero Member
*****
Offline Offline

Posts: 2111


St Barnabas Chapel (2009)


« Reply #2 on: July 24, 2011, 06:21:10 PM »

Richard
I thought mine was slow. They lost the paperwork twice fortunately I had emailed it to them so was able to show them the error of their ways. Even so it took nearly a year I think. Anyway congratulations!
Sean
Logged


Gestis Censere. 40x47mm DHW with TDC3. 3kW ASHP, 9kW GSHP, 3kW Navitron PV with Platinum 3100S GTI, 6.5kW WBS, 5 chickens. FMY 2009.
cliffski
Jr. Member
**
Offline Offline

Posts: 56


« Reply #3 on: July 27, 2011, 08:29:50 PM »

This is not cheering news Sad

I sent off my application 8 days ago, and recently chased it up, all by email (with read receipts...) I'm with Scottish & Southern energy too. My install was done by a third party MCS approved.
They told me today it will take 6-8 weeks, and if they arent happy with some documentation they will write to me. I asked for clarification that I would be earning money from my FIT during this time. No reply yet Cheesy
What is the story there?
I dont give a toss how slow it takes as long as I don't lose 8 weeks prime summer generation. If I do, then that's just a flipping scam, and I'll complain to everyone on earth, my MP, the energy minister blah blah Cheesy Anyone gone down that road?
Someone tell me I'm just being pessimistic...
Logged
wookey
Hero Member
*****
Offline Offline

Posts: 2672


WWW
« Reply #4 on: July 27, 2011, 11:08:48 PM »

You are just being pessimistic
Logged

Wookey
Justme
Hero Member
*****
Offline Offline

Posts: 2877



« Reply #5 on: July 27, 2011, 11:29:46 PM »

Miss the summer this year & you will gain the summer in the last year.

No biggy.
Logged

Navitron solar thermal system
30 x 58mm panel 259L TS
1200watts solar 120vdc
FX80 Solar controller
Victron 12v 3000w 120a
200w (250w peak) 12v turbine as a tester
6kva genny
6 x 2v cells 1550amp/h 5C
24 x 2v cells 700amp/h 5C
Total bank 4350 amp/h @12v
ecogeorge
Hero Member
*****
Offline Offline

Posts: 516


« Reply #6 on: July 27, 2011, 11:52:47 PM »

This is not cheering news Sad

I sent off my application 8 days ago, and recently chased it up, all by email (with read receipts...) I'm with Scottish & Southern energy too. My install was done by a third party MCS approved.
They told me today it will take 6-8 weeks, and if they arent happy with some documentation they will write to me. I asked for clarification that I would be earning money from my FIT during this time. No reply yet Cheesy
What is the story there?
I dont give a toss how slow it takes as long as I don't lose 8 weeks prime summer generation. If I do, then that's just a flipping scam, and I'll complain to everyone on earth, my MP, the energy minister blah blah Cheesy Anyone gone down that road?
Someone tell me I'm just being pessimistic...
If you have receipts for letters and copies of initial meter readings you should be ok.
http://www.youtube.com/watch?v=HaccLMuLa7o&feature=fvst

rgds George.
Logged
volzhskyboy
Jr. Member
**
Offline Offline

Posts: 93



« Reply #7 on: August 03, 2011, 04:24:24 AM »

Things went swiftly here,
Install completed 08th July,
ScottishPower wanted their application form for 'Clean Energy Cashback' scheme completed by the 15th July for them to accept the generation meter to be starting at '00000', application duly completed and returned to them by recorded delivery,
Letter of acceptance received from them dated 22nd July requesting a signed acceptance from me to be signed and returned by the 29th.
Job done.

Bill.
Logged

16  x Sanyo HITH250E01. SMA Sunnyboy 4000TL & Sunnybeam. 40 Deg incl, South facing. Lat 54° 36'
linesrg
Full Member
***
Offline Offline

Posts: 169



WWW
« Reply #8 on: September 12, 2011, 11:58:30 AM »

Good Morning,

Well finally on September 12th 2011 I have finally received a cheque from S&S relating to my figures from April 1st 2010 (also including payments due up until June 30th 2011), anybody out there want to try and beat this?

Regards

Richard
Logged

16off BP380 on a Lorentz tracker connected to 1off SMA SB2500 and 16off Chinese import 80W connected to a Fronius IG15 and 16off BP380 connected to a SWR2000.
whitehedge
Newbie
*
Offline Offline

Posts: 2


« Reply #9 on: September 21, 2011, 10:52:59 AM »

Miss the summer this year & you will gain the summer in the last year.

No biggy.

Depends on how old you are!

And if you still own the system I suppose.