navitron
 
Renewable Energy and Sustainability Forum
UK's most popular Renewable Energy Forum May 25, 2012, 02:53:05 AM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Anyone wishing to register as a new member on the forum is strongly recommended to use a "proper" email address - following recent spam/hack attempts on the forum, all security is set to "high", and "disposable" email addresses like Gmail, Yahoo and Hotmail tend to be viewed with suspicion, and the application rejected if there is any doubt whatsoever
 
Recent Articles: UPDATE ON DECC APPLICATION FOR LEAVE TO APPEAL TO THE SUPREME COURT | Yingli Green Energy's PV Module Ranks No.2 in TUV Rheinland Energy Yield Test | Navitron Solar Showers at Glastonbury for Year 5!
   Home   Help Search Login Register  
Pages: [1]   Go Down
  Print  
Author Topic: A new advance in chinese building  (Read 216 times)
offthegridandy
Jr. Member
**
Offline Offline

Posts: 86



« on: January 10, 2012, 11:19:20 AM »

http://uk.news.yahoo.com/time-lapse-video--30-storey-hotel-built-in-just-15-days.html

Whatch the video and see a monster tower built in just a few days. If these guys had built the tower of Babel it might have been finished in time!

Using cutting-edge building technology, which uses six times less cement and is believed to be five times more energy efficient than regular construction material, the 17,000-metre-squared earthquake-proof skyscraper was completed at the end of 2011.

Andy
Logged

8 KVA Lister TS2 Startamatic Genny
24 Volt 800amp battery bank
Trace SW3024 Inverter Charger
1.6 Kw PV array permanently ground mounted
Outback Flexmax 80
1.5 Kw wind turbine
7.5 Mtr Tower.
u/floor heating from oil boiler cross linked to 5Kw wood burner
renewablejohn
Hero Member
*****
Offline Offline

Posts: 1847



« Reply #1 on: January 10, 2012, 11:52:17 AM »

But what happens to the crane   wackoold
Logged
offthegridandy
Jr. Member
**
Offline Offline

Posts: 86



« Reply #2 on: January 10, 2012, 11:57:59 AM »

Turn it into a lift shaft or central ventilation cooling duct!!
Logged

8 KVA Lister TS2 Startamatic Genny
24 Volt 800amp battery bank
Trace SW3024 Inverter Charger
1.6 Kw PV array permanently ground mounted
Outback Flexmax 80
1.5 Kw wind turbine
7.5 Mtr Tower.
u/floor heating from oil boiler cross linked to 5Kw wood burner
Pages: [1]   Go Up
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.16 | SMF © 2011, Simple Machines Valid XHTML 1.0! Valid CSS!