i used a 2 " box section frame work fasened to the gable end to give me a south facing point
then i used a flat roof mounting kit
it took 3 mounths to fit due to it being a fill in job and me being layed up with a bad back for a mounth
it goes into my solar cylinder see seprate post
and its my fisrt sunny day today so no figures but as its up to 49 degree and its only 14.30 looks very promising and a bit more insalation to fit , then just put fitted wardrobs back together ( pipe work runs behind )
fitted a tdc3 controler and when id sused out how to program ( thanks john navitron ) it works a treat and was so simple to do
a specal thanks to all at navitron
now time to start saving the pennies to buy a grid tie turbine
