Hi all,
I've been watching the forum for a while, and found it a great resource (and source of amusement

)
I was trying to get my head around the theory of grid linking a listeroid engine which I've currently got powering an off grid system. How do you place a static load onto the generator (say 3kW)? - currently the engine is managed at constant revs so any load put on the gen is matched with appropriate throttle control - this obviously can't work for a grid link system. What sort of kit is required to manage the demand

?
Cheers,
James