News: Anyone wishing to register as a new member on the forum is strongly recommended to use a "proper" email address. Following continuous spam/hack attempts on the forum, "disposable" email addresses like Gmail, Yahoo and Hotmail tend to be viewed with suspicion, and the application rejected if there is any doubt whatsoever
 
Recent Articles: Navitron Partners With Solax to Help Create A More Sustainable Future | Navitron Calls for Increased Carbon Footprint Reduction In Light of Earth Overshoot Day | A plea from The David School - Issue 18
   Home   Help Search Login Register  
Pages: 1 2 3 4 [5]   Go Down
  Print  
Author Topic: UK Interconnectors  (Read 10798 times)
dan_b
Hero Member
*****
Offline Offline

Posts: 5167

SW London


WWW
« Reply #60 on: July 21, 2020, 07:04:25 AM »

Driving to France this morning and spotted this bunch of cables at the Tunnel. Looks like Eleclink, but looks like there’s still a lot of cable reeled up. Guess they’ve not done the cable pull yet then...


Logged

3.06kWp SolarEdge system with a split array:
2.18kWp 10x South facing, plus 4x West facing 880W

Mk1 ImmerSUN DHW diverter
4kW PowerVault Battery

Tesla Model 3 Long Range
Philip R
Hero Member
*****
Offline Offline

Posts: 1786

South Cheshire


« Reply #61 on: July 21, 2020, 09:32:25 AM »

Look again at your pictures Dan. You can see that the two drums of the black cable are in fact having cabling pulled off the drum. However the rear frame supports do not appear to have rollers fitted on them. The poor cables are going to get a bit scuffed on the way.
Logged
GarethC
Sr. Member
****
Offline Offline

Posts: 336


« Reply #62 on: October 08, 2020, 10:40:46 PM »

This of interest? Seems logical (but I don't know much about it).

https://renews.biz/63624/national-grid-builds-wind-connector-pipeline/
Logged
dan_b
Hero Member
*****
Offline Offline

Posts: 5167

SW London


WWW
« Reply #63 on: October 09, 2020, 09:01:25 AM »

Thanks - that's interesting.  My occasional trawls on news on HVDCs hadn't even dragged up Project Nautilus or Project EuroLink

http://sases.org.uk/wp-content/uploads/2019/01/NGV-Nautilus-Eurolink-Proposals-14-12-2018.pdf
Nautilus is/was a 1.4GW interconnector from Suffolk to Belgium. Looks like the idea was to have it connected by 2028.

With EuroLink being a similar 1.4GW interconnector from Suffolk to the Netherlands, built on a similar timescale.


Makes me wonder - why are both going to the same grid connection in Suffolk? Is there a nuclear power plant on the grid there that will be decommissioned around that time?

Logged

3.06kWp SolarEdge system with a split array:
2.18kWp 10x South facing, plus 4x West facing 880W

Mk1 ImmerSUN DHW diverter
4kW PowerVault Battery

Tesla Model 3 Long Range
Countrypaul
Hero Member
*****
Online Online

Posts: 1823


« Reply #64 on: October 09, 2020, 10:03:38 AM »

Since that is just beside Sizewell, will Sizewell C be built or is this a way to use some of the exiting infrastructure that exists since Sizewell A was decomissioned? Or are we looking at using the infrastructure for Sizewell C assuming B decomissions in 2035 (although maybe extended)?
Logged
dan_b
Hero Member
*****
Offline Offline

Posts: 5167

SW London


WWW
« Reply #65 on: October 09, 2020, 10:50:08 AM »

Aah there you go - yes I imagine this is to feed into the existing grid infrastructure that exists around Sizewell A?
Logged

3.06kWp SolarEdge system with a split array:
2.18kWp 10x South facing, plus 4x West facing 880W

Mk1 ImmerSUN DHW diverter
4kW PowerVault Battery

Tesla Model 3 Long Range
Philip R
Hero Member
*****
Offline Offline

Posts: 1786

South Cheshire


« Reply #66 on: October 09, 2020, 03:30:50 PM »

SZA grid connection was used by Great Gabbard windfarm. Saw the contractors working there last time I was on site.
US experiance will be to extend PWR lifetimes. They are now looking at 60 to 80 years. So long as neutron embrittlement of the pressure vessel and corrosion is controlled, a long life could be attained.
Two L6 routes to Sizewell site exist . If C station gets built, which is on the cards, then more transmission capacity will be required,
Logged
dan_b
Hero Member
*****
Offline Offline

Posts: 5167

SW London


WWW
« Reply #67 on: October 15, 2020, 12:17:40 PM »

Hot news!
IFA2 connection is now being tested in its commissioning phase - they were scheduled to complete by end of Q3 and they claim on their website that despite COVID they are on schedule. I think a couple fo weeks slippage given what's happened is probably close enough?!

Logged

3.06kWp SolarEdge system with a split array:
2.18kWp 10x South facing, plus 4x West facing 880W

Mk1 ImmerSUN DHW diverter
4kW PowerVault Battery

Tesla Model 3 Long Range
Alan D
Full Member
***
Offline Offline

Posts: 101


« Reply #68 on: October 15, 2020, 01:13:55 PM »

Might need some more Interconnectors installed Today.

National Grid has warned that Britain’s electricity will be in short supply over the next few days after a string of unplanned power plant outages and unusually low wind speeds this week.
Logged
Philip R
Hero Member
*****
Offline Offline

Posts: 1786

South Cheshire


« Reply #69 on: October 15, 2020, 02:16:56 PM »

IFA1 currentlly exporting to France about 240MW. Importing 1GW from Holland nothing to/from Belgium and full export to Ireland on both links .
Gas about 20 GW.
We are not at winter max load yet on either gas and electricity. So not a good place to be. Too many people in government and National grid talking up the demise of coal, yet here we are on the brink of a shortful with capacity restrictions in France too.
Have a read about the bridges in London too, same story really ( eye off the ball for too long).
Logged
dan_b
Hero Member
*****
Offline Offline

Posts: 5167

SW London


WWW
« Reply #70 on: October 20, 2020, 03:08:46 PM »

Just seen this news article about ElecLink - the 1GW HVDC being routed via the Channel Tunnel - north running line.

It's saying commissioning is now expected in mid-2022.

https://www.businesswire.com/news/home/20201015005722/en/Getlink-ElecLink-IGC-Approves-Start-of-Tests-at-the-Converter-Stations
Logged

3.06kWp SolarEdge system with a split array:
2.18kWp 10x South facing, plus 4x West facing 880W

Mk1 ImmerSUN DHW diverter
4kW PowerVault Battery

Tesla Model 3 Long Range
Pages: 1 2 3 4 [5]   Go Up
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.20 | SMF © 2013, Simple Machines
SMFAds for Free Forums
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!