navitron
 
Renewable Energy and Sustainability Forum
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Anyone wishing to register as a new member on the forum is strongly recommended to use a "proper" email address - following recent spam/hack attempts on the forum, all security is set to "high", and "disposable" email addresses like Gmail, Yahoo and Hotmail tend to be viewed with suspicion, and the application rejected if there is any doubt whatsoever
 
Recent Articles: Navitron Partners With Solax to Help Create A More Sustainable Future | Navitron Calls for Increased Carbon Footprint Reduction In Light of Earth Overshoot Day | A plea from The David School - Issue 18
   Home   Help Search Login Register  
Pages: [1]   Go Down
  Print  
Author Topic: Outstanding Scottish Wind Generation Sept / Oct  (Read 95 times)
M
Hero Member
*****
Offline Offline

Posts: 4283



« on: October 11, 2017, 05:02:21 PM »

Did I (we) miss this? I was watching an episode of Tesla Time News, an American Youtube blog, and they mentioned some staggering numbers. Scottish wind generating 200%+ of demand on one day, and 63% of demand (equivalent) for September. I managed to track down an article in the Belfast Telegraph!

Wind power generated double Scotlandís required electricity on October 2 Ė WWF

Quote
WWF Scotland analysed wind power data provided by WeatherEnergy and found wind turbines in Scotland provided 86,467MWh of electricity to the National Grid on October 2.

Scotlandís total electricity consumption, including homes, business and industry, for Monday was 41,866MWh, meaning wind power generated the equivalent of 206% of Scotlandís entire electricity needs on the day.

Quote
Wind turbines in Scotland provided 1,108,862MWh of electricity to the National Grid in September while the countryís total electricity consumption for the month was 1,768,505MWh.

Wind power, therefore, generated the equivalent of 63% of Scotlandís entire electricity needs for the month.
Logged

Just call me Mart.     Cardiff: 5.58kWp PV - (3.58kWp SE3500 + 2kWp SE2200 WNW)
dan_b
Hero Member
*****
Offline Offline

Posts: 3095


WWW
« Reply #1 on: October 11, 2017, 05:07:28 PM »

One reason why National Grid is building the North-South HVDC "Bootstrap" interconnector (now known as Westernlink) - to enable more Scottish renewables to be shifted south without curtailment. It's due to come online this year.
Logged

3.06kWp SolarEdge system with a split array:
2.18kWp 10x South facing, plus 4x West facing 880W

Mk1 ImmerSUN DHW diverter
4kW PowerVault Battery
Pages: [1]   Go Up
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.20 | SMF © 2013, Simple Machines
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!