navitron
 
Renewable Energy and Sustainability Forum
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Anyone wishing to register as a new member on the forum is strongly recommended to use a "proper" email address - following recent spam/hack attempts on the forum, all security is set to "high", and "disposable" email addresses like Gmail, Yahoo and Hotmail tend to be viewed with suspicion, and the application rejected if there is any doubt whatsoever
 
Recent Articles: Navitron Partners With Solax to Help Create A More Sustainable Future | Navitron Calls for Increased Carbon Footprint Reduction In Light of Earth Overshoot Day | A plea from The David School - Issue 18
   Home   Help Search Login Register  
Pages: [1]   Go Down
  Print  
Author Topic: Turbine installation is complete at Race Bank (573MW).  (Read 326 times)
stannn
Global Moderator
Hero Member
*****
Offline Offline

Posts: 4561



« on: December 18, 2017, 11:56:56 AM »

http://renews.biz/109559/turbines-stand-tall-at-race/

https://www.windpoweroffshore.com/article/1453040/race-bank-construction-completed
« Last Edit: December 18, 2017, 12:02:59 PM by stannn » Logged

2.45 kWp PV (Navitron supply), 40 evacuated tubes (Navitron supply), Clearview 650 log burner with back-boiler heating cottage and water, 2 off 50W border collies, 1 off 35W cat, 1 off 25W cat.
dan_b
Hero Member
*****
Offline Offline

Posts: 3522


WWW
« Reply #1 on: December 18, 2017, 01:30:37 PM »

Why are they not called Dong Energy anymore?! I always thought it amusing that Dong was building massive erections  hysteria
Logged

3.06kWp SolarEdge system with a split array:
2.18kWp 10x South facing, plus 4x West facing 880W

Mk1 ImmerSUN DHW diverter
4kW PowerVault Battery
azps
Sr. Member
****
Offline Offline

Posts: 468



WWW
« Reply #2 on: December 18, 2017, 03:12:26 PM »

Why are they not called Dong Energy anymore?! I always thought it amusing that Dong was building massive erections  hysteria

The old company was "Danish Oil & Natural Gas". But now they've ditched all the fossil fuels, the name had to change too.
Logged

stannn
Global Moderator
Hero Member
*****
Offline Offline

Posts: 4561



« Reply #3 on: June 13, 2018, 03:19:12 PM »

https://www.bbc.co.uk/news/uk-england-44469348

Race Bank is officially open.
Logged

2.45 kWp PV (Navitron supply), 40 evacuated tubes (Navitron supply), Clearview 650 log burner with back-boiler heating cottage and water, 2 off 50W border collies, 1 off 35W cat, 1 off 25W cat.
dan_b
Hero Member
*****
Offline Offline

Posts: 3522


WWW
« Reply #4 on: June 13, 2018, 03:30:42 PM »

Currently generating 236MW according to this

http://www.thecrownestate.co.uk/en-gb/our-places/asset-map/#tab-2
Logged

3.06kWp SolarEdge system with a split array:
2.18kWp 10x South facing, plus 4x West facing 880W

Mk1 ImmerSUN DHW diverter
4kW PowerVault Battery
Pages: [1]   Go Up
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.20 | SMF © 2013, Simple Machines
SMFAds for Free Forums
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!