navitron
 
Renewable Energy and Sustainability Forum
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Anyone wishing to register as a new member on the forum is strongly recommended to use a "proper" email address. Following continuous spam/hack attempts on the forum, "disposable" email addresses like Gmail, Yahoo and Hotmail tend to be viewed with suspicion, and the application rejected if there is any doubt whatsoever
 
Recent Articles: Navitron Partners With Solax to Help Create A More Sustainable Future | Navitron Calls for Increased Carbon Footprint Reduction In Light of Earth Overshoot Day | A plea from The David School - Issue 18
   Home   Help Search Login Register  
Pages: [1]   Go Down
  Print  
Author Topic: Elster A100c reading recovery  (Read 373 times)
SwingingSimian
Newbie
*
Offline Offline

Posts: 1


« on: June 10, 2020, 12:02:55 PM »

Hi

I have an Elster A100c as part of a system which is present in a house I moved into a few years back. The LCD screen failed last year and I have been admittedly been very poor at getting it sorted out. The generation LED was still flashing, so I am keen to try and get a reading via the IrDA before I get it replaced. However, the local solar installation company doesn't have the right kit to do this. And they have suggested sending it off to a specialist to get it recovered.

My thoughts on this are that it would be simply for a meter reading to be taken before removal if the engineer has the required optical reader. I'm also worried about losing the reading if it is disconnected from the system.

Does anyone have any advice or tips on how to deal with this? I think I'm owed hundreds.

Also, recommendations for a replacement. Local company is suggesting a Emlite ECA2 single phase, but am keen to prevent the same problem in future.

Thanks in advance for any input.



Logged
nowty
Hero Member
*****
Offline Offline

Posts: 1035



« Reply #1 on: June 10, 2020, 12:15:42 PM »

Your FIT provider may insist on a photo of the final reading on the meter as its replaced so a specialist reading may make no difference.

The longer you delay having a new one fitted the more you are at risk of losing, especially at this time of year of maximum yield.

You need to speak to your FIT provider to find out what they are prepared to accept, for example, you might find they accept an estimated reading based on last years production. The sooner you sort it out the better.

I would not worry about it happening again in the future, the meters are built to be incredibly reliable and the chances of it happening again are like winning the lottery, you can make a reasonable assumption that it will never happen.
Logged

12kW+ of PV installed and 60+ MWh's generated.
Home battery storage of 40+ kWh's.
Hot water storage of 15+ kWh's.
Heat storage of 15+ kWh's.
6kW Ground source heatpump.
EV BMW i3 (another 30+ kWh's of storage).
290,000+ litres of water harvested from underground river.
Pages: [1]   Go Up
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.20 | SMF © 2013, Simple Machines
SMFAds for Free Forums
Simple Audio Video Embedder
Valid XHTML 1.0! Valid CSS!