billi
|
 |
« Reply #15 on: January 14, 2021, 02:12:31 PM » |
|
.... i guess the diesel generators , can help too to recharge , a few crossings a day are only on battery power I remember Paul posting battery Pörn pics here in relation to the ferry power to gas will be an option one day too he hybrid diesel electric propulsion system will use at least 20% less fuel than a diesel mechanical propulsion system operating at design speed and with the vessel fully loaded, resulting in at least a 20% reduction in CO2 emitted by the Vessel. At lower speeds and light loaded conditions; greater fuel savings can be achieved and a greater reduction in CO2 emissions.On days with reduced numbers of crossings it will be possible to operate on batteries only for some crossings.In port the vessel is capable of operating on batteries only, zero emissions ......Overnight Charging: Power Supply – 400V, 3ph, 50Hz, 125A Advantage of cheaper over night tariff No plans to charge during the operation day From renewable source 10 -13 hour overnight charging window Automatic plug in system under investigation https://cmassets.co.uk/wp-content/uploads/2015/11/CMAL_HybridFerriesPresenatation_040512.pdf
|
|
|
Logged
|
1.6 kw and 2.4 kw PV array , Outback MX 60 and FM80 charge controller ,24 volt 1600 AH Battery ,6 Kw Victron inverter charger, 1.1 kw high head hydro turbine as a back up generator , 5 kw woodburner, 36 solar tubes with 360 l water tank, 1.6 kw windturbine
|
|
|
Fintray
|
 |
« Reply #16 on: January 14, 2021, 03:11:55 PM » |
|
Hallaig, the ferry, cant be easy to charge 750kwh from a 50kw supply overnight. How long is night up there.  Ken About all day at the moment 
|
|
|
Logged
|
3.87kWp PV 10.24kWp PV SolarEdge system Tesla Powerwall 2 100 x 47mm Navitron tubes (still being installed!) MK2 PV router DHW diverter Morso 5kW WBS Nissan Leaf
|
|
|
JohnS
|
 |
« Reply #17 on: January 14, 2021, 04:49:16 PM » |
|
I would have thought that there would be a case for the ferry having an onshore battery that is continually being charged so that it can be used to charge the onboard battery during turnarounds. I believe this is the procedure for the Helsingor - Helsingborg ferry between Denmark and Sweden.
Regarding the community hydro project, the big uncertainty is how much other green energy is produced on Skye and how much of it is curtailed due to the maximum export limit for the Isle. Also, once the export limit is increased, which generators will rank highest in being allowed to use it?
It also looks to me as though there is none or minimal water storage in the catchment areas and therefore when production is curtailed, the water resource is 'wasted'. Unlike with a dam where the resource is kept for later use.
|
|
|
Logged
|
2.1kWp solar PV PHEV West London
|
|
|
camillitech
|
 |
« Reply #18 on: January 14, 2021, 07:35:50 PM » |
|
Hallaig, the ferry, cant be easy to charge 750kwh from a 50kw supply overnight. How long is night up there.  Ken But it is a 137kW supply 
|
|
|
Logged
|
http://lifeattheendoftheroad.wordpress.com/'Off grid' since 1985, Proven 2.5kW, Proven 6kW direct heating, SMA SI6.OH, 800ah Rolls, 9kW PV ,4xTS45, Lister HR2 12kW, , Powerspout pelton, Stream Engine turgo, 60 x Navitron toobs and a 1500lt store. Outback VFX3048 and 950ah forklifts for backup,
|
|
|
camillitech
|
 |
« Reply #19 on: January 14, 2021, 07:44:37 PM » |
|
Hallaig, the ferry, cant be easy to charge 750kwh from a 50kw supply overnight. How long is night up there.  Ken But why limited to 50KW? The Hydro is lmited to 137KW and therefore the charge could be 137+50 = 187KW (Ok assumes no one on the island uses any other electric), so only needs about 4hrs  Aye, Hallaig is capable of accepting a 250A supply but current input is limited to 125A meaning we can fully charge in around 10h. So I guess anything over 100kW would suffice.
|
|
|
Logged
|
http://lifeattheendoftheroad.wordpress.com/'Off grid' since 1985, Proven 2.5kW, Proven 6kW direct heating, SMA SI6.OH, 800ah Rolls, 9kW PV ,4xTS45, Lister HR2 12kW, , Powerspout pelton, Stream Engine turgo, 60 x Navitron toobs and a 1500lt store. Outback VFX3048 and 950ah forklifts for backup,
|
|
|
camillitech
|
 |
« Reply #20 on: January 14, 2021, 07:53:52 PM » |
|
I would have thought that there would be a case for the ferry having an onshore battery that is continually being charged so that it can be used to charge the onboard battery during turnarounds. I believe this is the procedure for the Helsingor - Helsingborg ferry between Denmark and Sweden.
Aye John, I have suggested something similar ( having a large battery bank ashore ) in the past as a means of improving resilience to our frequent power cuts and surges which play havoc with the electronics, despite isolation transformers and multiple UPS systems. Even the main batteries are utilized as a 'shore UPS' in the event of grid failure above 30% SOC. Sadly ruled out on grounds of cost and we do not have a long enough 'turn around' to charge between sailings
|
|
|
Logged
|
http://lifeattheendoftheroad.wordpress.com/'Off grid' since 1985, Proven 2.5kW, Proven 6kW direct heating, SMA SI6.OH, 800ah Rolls, 9kW PV ,4xTS45, Lister HR2 12kW, , Powerspout pelton, Stream Engine turgo, 60 x Navitron toobs and a 1500lt store. Outback VFX3048 and 950ah forklifts for backup,
|
|
|
|